
Aerial Lift Inspection and Testing
Includes:
Visual inspection of upper and lower boom (fiberglass, hoses, leveling system, etc. for any possible contaminants), Operational check of unit, Dielectric test of the upper boom, lower boom insert, over-all, bucket liner and hydraulic oil in compliance with ANSI/SIA A92.2-1990 and ASTM D877, Certification label, and a certified test report.
Hot-Stick Testing
Includes:
Cleaning and waxing, Minor repairs (install end caps), Dielectric testing to IEEE 978-1984, Certification label, and a certified test report.
Temporary Ground Set Testing
Includes:
Visual inspection, Cleaning of cables and clamps, Minor repairs (Tightening of connections), Testing per ASTM F2249-03, Certification label and a certified test report.
|

 |